Building a Bridge

Building a bridge over the Cohocton River in Corning NY. Our 500-ton crane lifted ten 100’ pre-stressed concrete beams weighing 110k lbs. across two spans. This was completed by building a causeway to the middle pier and being able to lift all the beams from a single setup without needing a slider beam.

Bonus question- What shape is the beam?

Building a Bridge

Building a bridge over the Cohocton River in Corning NY. Our 500-ton crane lifted ten 100’ pre-stressed concrete beams weighing 110k lbs. across two spans. This was completed by building a causeway to the middle pier and being able to lift all the beams from a single setup without needing a slider beam.

Bonus question- What shape is the beam?

Water storage Tank

Constructing a water storage tank with tilt up pre cast concrete panels. Our 350-ton crane lifted each panel weighing 60k lbs. from a horizontal bed and rotated vertical using both hoists on the crane then setup into position where each panel is supported by bracing. After completing three quarters of the tank the crane will move to the outside perimeter and finish installing the final panels.

Top Views

Industrial maintenance with planned shutdowns

Industrial maintenance with planned shutdowns

Industrial maintenance with planned shutdowns requires efficient scheduling and effective safety. Mansfield Crane is “Always Ready” to supply the management, and planning, to meet these requirements throughout Pennsylvania and Upstate New York.