Constructing a water storage tank with tilt up pre cast concrete panels. Our 350-ton crane lifted each panel weighing 60k lbs. from a horizontal bed and rotated vertical using both hoists on the crane then setup into position where each panel is supported by bracing. After completing three quarters of the tank the crane will move to the outside perimeter and finish installing the final panels.